Skip to content
  • Home
  • About Us
    • Our Team
  • Services
  • Portfolio
  • Contact Us
  • Home
  • About Us
    • Our Team
  • Services
  • Portfolio
  • Contact Us

Lot Severance in Simcoe County

If you own land in Simcoe County and want to split off a new lot for a family member, a sale or a new home, you need municipal approval, called a consent. Morgan Planning & Development helps property owners work out whether a severance is feasible, then prepares and manages the application through approval. Where your property sits matters: Barrie and Orillia run their own approvals, while the county’s townships each process consents under both county and local policy. 

What is a lot severance?

A lot severance is the legal division of one property into two or more separate lots. In Ontario it’s approved through a consent application under the Planning Act. 

In practice, that means:

  • Confirming the new and remaining lots both meet the Official Plan and zoning by-law: size, frontage, use and access.
  • Showing each lot can be serviced, whether by municipal water and sewer or a private well and septic system.
  • Applying to the approval authority, going through public notice and a hearing, then meeting any conditions before the lots are created.

Severances are also used for lot additions (adjusting a boundary between neighbours) and for creating easements. The approval process is similar.

Why are severances in Simcoe County more involved?

Most of Simcoe County is rural or agricultural, and provincial and county policy restricts creating new residential lots in those areas. A severance that’s routine on a serviced street in town can be difficult, or not permitted, on farmland. 

Several local factors often shape an application:

  • Agricultural land. New lots in prime agricultural areas are generally limited to specific cases, such as a surplus farm dwelling after farm consolidation. 
  • Minimum Distance Separation. Rural lots may need to meet setback formulas from livestock barns and manure storage.
  • Conservation authority review. Properties near rivers, wetlands or the Lake Simcoe and Georgian Bay shorelines may need review from the Lake Simcoe Region Conservation Authority or Nottawasaga Valley Conservation Authority. 
  • Private servicing. Rural lots usually need to show a new septic system and well can work on the proposed lot size.
  • Different local rules. Each municipality has its own zoning by-law, minimum lot sizes, application fees and pre-consultation requirements.

Knowing which of these apply before you pay application fees is the main reason to get planning advice early.

Thinking about severing your property? Tell us where the land is and what you want to create, and we’ll talk through whether it’s likely to fit local policy. Let’s Discuss Your Project

How our severance process works

  1. Feasibility review. We check your property’s Official Plan designation, zoning, lot dimensions, access and servicing against local policy, and tell you plainly whether the severance looks supportable and what could stand in the way.
  2. Pre-consultation with the municipality. Most municipalities require or encourage a pre-consultation meeting. We attend, confirm what studies the municipality will ask for, and identify concerns early. 
  3. Application and supporting material. We prepare the application and, where needed, a planning justification report explaining how the proposal meets provincial, county and local policy. We coordinate any other studies, such as a survey or a servicing or environmental review.
  4. Notice, hearing and follow-through. We manage circulation to agencies and neighbours, respond to comments, and represent the proposal at the hearing. If a decision is appealed, the matter can go to the Ontario Land Tribunal.
  5. Clearing conditions. Approvals usually come with conditions, such as a survey, a road widening or parkland fees, that must be met within a set time. We track and clear them so the consent can be finalized.

See more completed approvals on our Portfolio page. 

What does a severance cost?

The total cost of a severance depends on the property, the municipality and what studies the application needs. Every project is quoted individually. The main cost drivers are:

  • Municipal application fees, set by each municipality’s fee by-law.
  • Surveys and reference plans.
  • Supporting studies, if required (servicing, environmental, agricultural or traffic).
  • Conditions of approval, such as parkland fees.
  • Planning consulting for the application and hearing.

When you contact us, share your timeline and budget and we’ll outline what your project is likely to involve.

Frequently asked questions

How long does a lot severance take in Simcoe County?
Timelines vary by municipality and by how complex the application is. Simple, complete applications move faster; rural lots needing studies or agency review take longer. The Committee of Adjustment’s hearing schedule and the time to clear conditions both add to the total. 

Can I sever a lot from my farm or rural property?
Sometimes, but rural and agricultural lot creation is restricted in Ontario and in Simcoe County. Whether it’s possible depends on your land’s designation, lot size, servicing and nearby agricultural uses. A feasibility review is the fastest way to find out.

What is a surplus farm dwelling severance?
It’s a severance that separates an existing farmhouse from farmland when the house is surplus after farms are consolidated. It’s one of the few ways to create a residential lot in prime agricultural areas. It has specific conditions, including limits on future homes on the remaining farmland. 

Do I need a planner to apply for a severance?
No. Property owners can apply on their own. A planner helps by identifying policy problems before you apply, preparing the justification municipalities expect, and managing agency comments, the hearing and conditions. This reduces the risk of delays or a refusal.

What happens if a neighbour objects or the application is refused?
The decision can be appealed to the Ontario Land Tribunal within the appeal period after notice of the decision. Objections don’t automatically mean refusal; the decision turns on planning policy. We’ll explain your options if it comes to that. 

Ready to find out if your property can be severed? Tell us about your land, your timeline and your budget. Let’s Discuss Your Project

Navigation

  • Home
  • About Us
  • Services
  • Portfolio
  • Contact

Contact Us

  • Phone: 705-327-1873
  • Email: mcooper@morganplanning.ca
  • Office: 21 Matchedash St. S #101
  • Privacy Policy
  • Site Map